Meinert Ranch, Texas — 90% Hydrocarbon Reduction in 7 Hours

90% TPH reduction in 7 hours

Industry

Oil & Gas

Location

Texas, US

Product

X4JH2000-HEP

Status

Documented

Challenge

This deployment addressed a oil & gas site in Texas, US where existing remediation methods could not meet regulatory closure timelines or cost targets. Full site characterization and contaminant profile available in the field report.

Method

X4JH2000-HEP applied at standard 1:10 dilution using site-appropriate equipment (spray, slurry mix, or in-line dosing). Pre- and post-application sampling conducted under chain of custody.

Results

90% TPH reduction in 7 hours. Detailed sampling data, photographic documentation, and chain-of-custody records included in the full PDF report below.